In the deep freeze of January 2014, James tried to pull Donald and Douglas out of the snow but failed.įrom the pilot episode to The Search for Smudger, SI3D's 2010 model of James was used. He managed to catch them, but because he was going backwards, he crashed into BoCo. However, Wretch broke the coupling at the top of Gordon's Hill and the trucks ran away. James, feeling cocky, took Wretch out with his train the next day and tried to keep him in order. In the Summer of 2013, a tanker named Wretch was causing trouble and made poor Henry damage his brakes. Along with Gordon and Henry, James went on strike in 1949. This all stopped when Gordon accidentally went down the wrong line, and James had to take his express. The Fat Controller was very pleased, though Henry and Gordon still teased him. Unlike his first encounter with them, he took no nonsense and fiercely brought them to the destination, despite the trucks running away at Gordon's Hill. Eventually, the Fat Controller let him out and he took some trucks. As punishment for that and previously ruining the Fat Controller's new top hat, he was shut up in the shed. He was very rough and caused a hole in their brakes once which had to be mended with a passenger's boot lace. Because he is a mixed traffic engine, he can pull both coaches and trucks. After being mended, James spent some time learning on Thomas's branch line until being sent back to the main line later. Thomas came to his rescue and James was repainted red, which he is very proud of. Some troublesome trucks pushed him off the rails. James was built in 1912 and worked in England until he was bought by the Fat Controller in 1945. 5.3 Thomas1Edward2Henr圓's Railway Series.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |